The space

Floor plans.

Every level, measured. Area schedule and plans from the RealServe survey — step through each sheet below.

Floor plan — Summary of areas
Summary of areas · Sheet 1 of 5
BasementCar park2,379.8 m²
GroundOffice 1,704.1 m² · plant 53.9 m²1,758.0 m²
Level 1Office2,672.0 m²
Level 2Office1,419.2 m²
TotalGross floor area8,229.0 m²

Areas from the RealServe survey, October 2024. GFA includes the basement car park and plant. Areas should be independently verified.